This BIM service for the Data Center project in Cikarang delivers a highly detailed and fully coordinated digital model that integrates architectural layout, structural systems, and complex MEP infrastructure within a single BIM environment. The scope focuses on precise modeling of critical data center components such as mechanical cooling systems, piping networks, electrical distribution, and equipment layouts, supported by detailed coordination views, sections, and construction-ready documentation. Through systematic clash detection, issue tracking, and model-based validation, the BIM process ensures constructability, optimizes spatial efficiency, and reduces risk during installation. The result is a robust, accurate, and build-ready BIM deliverable that supports reliable data center operations and efficient project execution.