This BIM service for the PURE DC Data Center in Bekasi delivers a highly detailed, construction-level coordination model focused on the complex requirements of a mission-critical data center facility. The scope integrates architectural layout, structural systems, and intensive MEP infrastructure—including cooling equipment, piping, electrical distribution, and rooftop plant arrangements—within a single BIM environment. Through advanced 3D modeling, clash detection, issue tracking, and coordination reporting, the BIM process identifies and resolves conflicts between beams, slabs, cable trays, ducts, and pipes prior to construction. The result is a precise, risk-mitigated, and build-ready BIM deliverable that supports efficient installation, operational reliability, and long-term performance of the data center.